■ storage and transportation
The product shall be stored in a cool, dry and ventilated place to prevent direct sunlight, isolate the fire source and keep away from the heat source. The storage period of paint and curing agent is 12 months. During transportation, the products shall be protected from rain, sunlight and collision, and shall comply with the transportation regulations of the transportation department on dangerous chemicals.
■ precautions
1. Pay attention to ventilation at the construction site, take fire prevention, anti-static, poisoning prevention and other measures, and abide by the coating operation procedures and relevant regulations.
2. Before use, adjust the paint and curing agent according to the required ratio, mix as much as you need, use it after mixing evenly, use it up within the specified time, mix the two components evenly, and use it after standing for 15-30 minutes.
3. The tools used before construction must be dry and clean.
4. During paint preparation and coating, it is strictly prohibited to contact with water, acid, alkali, alcohol, oil and amine substances. After paint preparation, the curing agent packaging barrel must be tightly covered to avoid loss caused by cementation.
5. The relative humidity during construction, drying and curing shall not be greater than 85%. The product can be delivered for use only after 7 days of curing after coating.
■ main purpose
Anti corrosion of chemical equipment, pipelines and steel structure surfaces, and protection and decoration of bridges, TV towers, ports, wharfs, offshore drilling platforms and other large facilities.
■ main features
The product film has excellent adhesion, hardness, good weather resistance, chemical resistance and corrosion resistance.
■ package specification
(original paint) 20kg / barrel, (curing agent) 3.5kg/barrel.
■ technical indicators
The color and appearance of the paint film shall be flat, and the color shall comply with the sample
Nonvolatile content (original paint),% ≥ 50
Drying time (standard thickness single coating), 23 ± 2 ℃
Surface dry, H ≤ 2
Hard work, H ≤ 48
Outflow time (coated 4# cup, 23 ± 2 ℃), s ≥ 40
Gloss (60 °)% agreed
Hardness (pencil hardness) ≥ H
Adhesion (cross cut method, 1mm), grade ≤ 1
Flexibility, mm ≤ 1
■ matching paint
(primer) epoxy two-component primer (intermediate coating) epoxy micaceous iron intermediate coating
■ surface treatment
Remove oil and sundries on the surface of the paint film.
■ painting reference
Dry film thickness: 23 ± 3um
Curing: 7 days
Proportioning: Paint: curing agent FG-01 = 100:8 (weight ratio)
Applicable period (23 ℃): 7h
Recoating interval: ≥ 8h, ≤ 72h.
Recommended number of coating courses: one primer, one intermediate coat and two finishing coats, and the dry film thickness shall not be less than 120 u M.
Diluent: tk-01 fluorocarbon paint diluent
Impact strength, kg.cm ≥ 50
The resistance to 5% NaOH solution (23 ± 2 ℃) did not change for 30 days
Resistance to 5% H2SO4 solution (23 ± 2 ℃) for 30 days without change
The resistance to 5% NaCl solution (23 ± 2 ℃) did not change for 30 days
The resistance to 5% HCl solution (23 ± 2 ℃) did not change for 30 days