
 
 
 Nano Thermal Insulation Coating
      
        Nano Thermal Insulation Coating
      
    
    
   Architectural Coatings
      
        Architectural Coatings
      
    
     Waterproof Coating
      
        Waterproof Coating
      
    
     Floor Paint
      
        Floor Paint
      
    
     Industrial Anticorrosive Coating
      
        Industrial Anticorrosive Coating
      
    
    
   Metal Series
      
        Metal Series
      
    
    
   Art Coating Series
      
        Art Coating Series
      
    
    
  
■ storage and transportation
The product shall be stored in a cool, dry and ventilated place to prevent direct sunlight, isolate the fire source and keep away from the heat source. The storage period of paint and curing agent is 12 months. During transportation, the products shall be protected from rain, sunlight and collision, and shall comply with the transportation regulations of the transportation department on dangerous chemicals.
■ precautions
1. Pay attention to ventilation at the construction site, take fire prevention, anti-static, poisoning prevention and other measures, and abide by the coating operation procedures and relevant regulations.
2. Before use, adjust the paint and curing agent according to the required ratio, mix as much as you need, use it after mixing evenly, use it up within the specified time, mix the two components evenly, and use it after standing for 15-30 minutes.
3. The tools used before construction must be dry and clean.
4. During paint preparation and coating, it is strictly prohibited to contact with water, acid, alkali, alcohol, oil and amine substances. After paint preparation, the curing agent packaging barrel must be tightly covered to avoid loss caused by cementation.
5. The relative humidity during construction, drying and curing shall not be greater than 85%. The product can be delivered for use only after 7 days of curing after coating.